A Resolution Authorizing THE RESURFACING AND RESTRIPING OF MARTIN LUTHER KING, JR BOULEVARD whereas, Martin Luther King, Jr. Boulevard is a connector roadway consisting of a five \n \n lane segment between Buena Vista Road and Brown Avenue, and a four lane \n \n segment between Brown Avenue and 10th Avenue; and,
whereas, this roadway is rated a 44 under the Department of Engineering?s Paving \n \n Management, and is need of resurfacing; and, \n \n \n \n WHEREAS, it has been determined that existing lane striping should \n \n remain for this roadway; and, \n \n \n \n WHEREAS, the PATH Foundation has proposed a 12 foot wide multi-use \n \n trail and streetscapes that would be developed in conjunction with this \n \n project, that requires a section of this roadway to be converted to three \n \n lanes; and, \n \n WHEREAS, funding for this project to include resurfacing, restriping \n \n multi-use trail, signal and intersection improvements, as well as the \n \n coordination of the Martin Luther King, Jr. Learning Trail, has been budgeted \n \n from OLOST Infrastructure, Paving Fund, and TSPLOST Discretionary Funds in the \n \n amount of $4,000,000; \n \n
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY
RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to direct the Department of \n \n Engineering to resurface and restripe Martin Luther King, Jr. Boulevard, five \n \n lanes beginning at Buena Vista Road to Brown Avenue, and four lanes beginning \n \n at Brown Avenue to 10th Avenue. The City Manager is further authorized to \n \n proceed forward with the proposed 12 foot wide multi-use trail as proposed by \n \n the PATH Foundation., Inc. and signal/intersection improvements with the \n \n funding available.
___________
Introduced at a regular meeting of the Council of Columbus, Georgia, held the _________ day of _____________ and adopted at said meeting by the affirmative vote of _____________ members of said Council.
No attachments for this document.