I. DRIVEWAY VARIANCE - 6015 CARIBOU DRIVE:



Approval is requested to deny the request for variance to allow

driveway access to Forrest Road from 6015 Caribou Drive. The City is expending

approximately $7.0 million on widening and improving traffic flow along this

section of Forrest Road. Approval of these types of requests for access would

negate the improvements being made. This particular parcel is located

approximately 150 ft. from Lansing Avenue and could create conflict for the

intersection.





II. PURCHASES:



Approval is requested of items "A" thru "J":



A. Repair of 2001 Caterpillar Off Road Dump Truck

B. Repair of 2007 Caterpillar 725 Haul Truck

C. Temporary Staffing For The Civic Center (Annual Contract)

D. Computer Hardware and Licensing For SIP Implementation

E. Large Industrial Fans For The Recycling And Sustainability Center

F. Equipment And Support For the IPTV Project

G. Amend Annual Contract For Internet Services to Include Cable Television

Services

H. Ford F-150 4x4 Truck - Georgia Statewide Contract

I. Ford Expedition - Georgia Statewide Contract

J. Postage Reimbursement







III. PRESENTATION AND UPDATE:



- - Williams Road/Fortson Road Traffic Improvement Update, Donna

Newman, Engineering Director





Bid Advertisements

(Schedule opening bid dates)





October 18, 2017

1. Watershed Fertilization (Annual Contract) ? RFB No. 18-0012

Scope of RFB

Provide erosion control at various watershed lakes. The contract term will be

for two (2) years, with the option to renew for three (3) additional

twelve-month periods.



2. CS 2228/Ft. Benning Road from CS 325/Levy Road to Fort Benning ? RFB No.

08-0011

Scope of Bid

Construct the proposed road and landscape improvements along Ft. Benning Road

between Shelby Avenue and the entrance to Fort Benning in Columbus, GA. The

work primarily involves installation of sidewalk, street pavement, concrete

curb, and landscaping as depicted on the drawings provided as part of these

Contract Documents. The DBE goal for this project is 14%. The Georgia

Department of Transportation Standard Specifications, 2013 Edition, GDOT

Supplemental Specifications Book, 2016 Edition, and applicable Supplemental

Specifications and Special Provisions apply to this project.



Bidders are required to be pre-qualified or registered subcontractors with

Georgia Department of Transportation (GDOT); Bidders submitting bids in excess

of $2,000,000.00 must be prequalified with GDOT; Subcontractors shall be

pre-qualified or registered with GDOT.



October 20, 2017

1. On-call Services for Installation or Replacement of Sidewalks and ADA Ramps

Located Throughout Columbus, Georgia (Annual Contract); RFP No. 18-0009

Scope of RFP

Install or replace sidewalks, ADA ramps and minor concrete work, such as

driveway aprons, concrete islands, curb and gutter, etc., throughout

Columbus-Muscogee County, on an as-needed basis. The term of the contract

shall be for two years, with the option to renew for three (3) additional

twelve-month periods.



2. Community Development Software; RFP No. 18-0008

Scope of RFP

Provide Columbus Consolidated Government with an enterprise software solution

for the Community Reinvestment Department to assist with grant management.



October 25, 2017

1. Office Supplies (Annual Contract) ? RFB No. 18-0009

Scope of RFB

Provide office supplies on an ?as needed? basis to various departments of the

Columbus Consolidated Government. The term of the contract shall be for two

(2) years, with the option to renew for three (3) additional twelve-month

periods.



2. Tree Maintenance Services (Annual Contract) ? RFB No. 18-0013

Scope of RFB

Provide supervision, labor, tools, equipment and services required for

tree maintenance services on an ?as needed? basis for Columbus Consolidated

Government Urban Forestry and Beautification Division. The term of the

contract shall be for two (2) years, with the option to renew for three (3)

additional twelve-month periods.



3. Commercial Internal Freezer Unit and Cooler Unit for Muscogee County Prison

? RFB No. 18-0015

Scope of RFB

The Columbus Consolidated Government (the City) is seeking vendors to

provide a commercial internal freezer unit and cooler unit for use in the

Muscogee County Prison.



November 1, 2017

1. Columbus Martin Luther King Trail ? RFB No. 18-0018

Scope of RFB

Construct the proposed Martin Luther King Trail in Columbus, Georgia. The work

primarily involves installation of sidewalk, street pavement, concrete curb and

gutters, chain link fencing, and construction of a pedestrian and bike friendly

trail with landscaping.