I. 1990 GEORGIA MUNICIPAL ASSOCIATION (GMA) LEASE POOL PAYOFF:
Authorization is requested to payoff the 1990 GMA Lease Pool Variable
Rate Demand Bonds. An agenda report and resolution are attached. Click link
to access documents.
II. PURCHASES:
Approval is requested for items "A" thru "F": Click link to access
documents.
A. Change Order No. 1 and MOU for Engineering Services Related to the Closure
of the Old Camp Landfill
B. Membership Dues for National League of Cities
C. Membership Dues for GMA
D. Cab and Chassis for 7-Yard Dump Truck Bodies
E. Municipal Street Sweeper
F. Recycling Collection Body
City Manager's Agenda
08/12/2008
Page 2
Bid Advertisements
(Scheduled bid opening dates)
August 20, 2008
Riverwalk Project ? 12th Street to 13th Street ? RFB No. 09-0001
Scope of RFB
The Consolidated Government of Columbus, Georgia (Owner) requests bids for the
construction of a proposed Riverwalk extension from the existing water tower on
12th Street, along the north side of 12th Street to Front Avenue, extends north
along Front Avenue in front of the Eagle Phenix Mill No. 3. Also, the
Riverwalk extends from the end of Riverwalk Phase I, along the River North to
approximately 13th Street. The work primarily involves clearing, grubbing,
grading installation of retaining walls, guardrail on retaining walls, paving,
concrete stairs, handrails and related items as depicted on the drawings
provided as part of the contract drawing. The Bidder is advised that the
location of the Riverwalk as defined in the drawings may be subject to change.
The Owner reserves the right to make minor adjustments in the alignment as
necessary to meet operational and aesthetic requirements.
Airless Line Striper ? PQ No. 09-0001
Scope of Quote
Provide two (2) Graco Line Lazer 3400 (or equal) paint machines to be used by
the Parks & Recreation Department.
August 22, 2008
Vehicle w/Mounted Pipe Inspection Camera Equipment ? RFP No. 09-0003
Scope of RFP
The Engineering Department of the Columbus Consolidated Government is
requesting proposals to provide one (1) color, closed-circuit television
inspection system completely installed in a van with 16? hi-cube body, ready
for operation. The system shall be capable of inspecting pipes and sewer lines.
The system shall be used for the inspection of underground infrastructure
assets from a single access point.
City Manager's Agenda
08/12/2008
Page 3
Bid Advertisements
(Scheduled bid opening dates)
September 2, 2008
Study to Establish Waste Collection Fee ? RFP No. 09-0004
Scope of RFP
Columbus Consolidated Government (the City) is seeking qualified firms to
perform a study to establish a waste collection fee schedule. All rate studies
shall consider both the once per week household waste pick up and the twice per
week household waste pick up.
September 26, 2008
Columbus South Development Opportunity ? RFP No. 08-0025
Scope of RFP
The City of Columbus is seeking proposals for the purchase and development of
35.57 (+/-) acres of vacant land located off Cusseta Road and Fort Benning
Road. Over the past few years, this area has seen revitalization efforts that
helped improve the quality of life of the community by building new housing and
adding new businesses. Some of the housing developments include the Baker
Village Revitalization, which will create 244 new apartment units, and the
Ambling Development, which is anticipating creating 250 units. In addition,
several transportation improvements are underway, such as a proposed four (4)
lane widening of Cusseta Road, which will help alleviate congestion problems
and will improve access to the area.
November 1, 2008
Consulting Services for Historic Design Guidelines ? RFP No. 09-0001
Scope of RFP
The Columbus Consolidated Government is seeking proposals to update and
reformat the existing Design Guidelines used for approval of Certificate of
Appropriateness in the locally designated historic districts. This project does
not call for entirely new sets of guidelines. Instead, the successful
consultant will work with and refine existing guidelines creating opportunities
for interpretations that are more specific, color renderings, digitalization,
and other tools.
Attachments