Columbus, Georgia

Georgia's First Consolidated Government

Post Office Box 1340
Columbus, Georgia, 31902-1340
(706) 653-4013
fax (706) 653-4016

Council Members

AN ORDINANCE



NO.



An ordinance amending the Unified Development Ordinance (UDO) for Columbus,

Georgia so as to amend certain sections of the Unified Development Ordinance of

Columbus, Georgia so as to alter Chapter 10 Article 8 and Chapter 8 Article 9.



---------------

THE COUNCIL OF COLUMBUS, GEORGIA HEREBY ORDAINS:

Section 1.

Chapter 10 of the Unified Development Ordinance is hereby amended by repealing

Article 8 in its entirety and replacing it with a new Article 8 to read as

follows:



?Article 8. Building Permitting



Section 10.8.1 Procedure to Obtain a Building Permit.



Refer to Section 8-14.4 of the Columbus Code for Building Permit Requirements

and Fees.?



SECTION 2.

Chapter 8 of the Unified Development Ordinance is hereby amended by repealing

Section 8.9.1.A and replacing it with a new Section 8.9.1.A to read as follows:

?A. Issuance of Permits. When required, building permits shall be issued in

conformance with the technical codes adopted and amended by the City under the

Georgia uniform Codes Act. Refer to Sec. 8-14.4 of the Columbus Code for

Building Permit Requirements and Fees.?

SECTION 3.

Chapter 8 of the Unified Development Ordinance is hereby amended by inserting

new Sections 8.9.1.G and 8.9.1.H to read as follows:

?G. Zoning verification. Prior to issuance of a building permit, a verification

shall be obtained. The following information shall be reviewed prior to this

action.

1. Single family or two-family ?Duplex? Dwellings. For a single family

detached or two-family dwelling, a plat of the lot showing the outline of the

principal building and minimum building setback lines for the lot.

2. Multi-family or nonresidential Buildings. For a multi-family or

nonresidential building, the site plan upon which was granted project approval

by the director of Inspections and Code.

3. Street Address. A street address number as assigned by the geographic

Information System Division (GIS).

H. Simultaneous Application and Review. An application for a building permit

may proceed simultaneously with and application for project approval of a site

plan, but the permit may not be issued prior to project approval of such site

plan by the Engineering Department.?

SECTION 4.

All ordinances or parts of ordinances in conflict with this ordinance are

hereby repealed.

---------------



Introduced at a regular meeting of the Council of Columbus, Georgia held on the

25th day of April, 2017 introduced a second time at a regular meeting of said

Council held on the ______ day of ________, 2017, and adopted at said meeting

by the affirmative vote of ________ members of said Council.







Councilor Allen voting____________.

Councilor Baker voting____________.

Councilor Barnes voting____________.

Councilor Davis voting____________.

Councilor Garrett voting____________.

Councilor Henderson voting____________.

Councilor Huff voting____________.

Councilor Pugh voting____________.

Councilor Thomas voting____________.

Councilor Woodson voting____________.









______________________________ ______________________________

TINY B. WASHINGTON TERESA PIKE TOMLINSON

CLERK OF COUNCIL MAYOR

Attachments


No attachments for this document.

Back to List