(A) ON-CALL SERVICES FOR INSTALLATION OR REPLACEMENT OF FENCING LOCATED
THROUGHOUT COLUMBUS, GA (ANNUAL CONTRACT) ? RFP NO. 15-0001
It is requested that Council authorize the execution of an annual contract with
Denny Enterprises (Fortson, GA), Nolin Fence and Deck (Phenix City, AL) and
Young Fencing Company (Columbus, GA) for the installation or replacement of
fencing throughout Columbus-Muscogee County on an as-needed basis. The
contractors will submit quotes to the Engineering Department, or other
requesting department, for each project that arises during the course of the
contract.
The City frequently finds, throughout each year, the need to install or replace
fencing surrounding government facilities, recreational fields, parking lots,
etc. Based on past experience, the City replaces roughly several hundred
linear feet of fencing per year. However, this quantity is only an estimate;
the City may require more or less quantities during each year of the contract
term.
The contractors shall furnish all labor, materials, equipment and miscellaneous
items required for the complete installation or replacement of fencing, which
includes but is not limited to: chain link, wrought iron, post and rail,
aluminum, and vinyl fence systems. For each project, the fencing shall be
installed in the location and grade that will be shown on the drawings or as
directed by the City, in complete conformity with the manufacturers? written
recommendations. The Engineering Department, or other requesting department,
will provide the exact scope of work and specifications for each project, as
the need arises.
The contract term shall be for two (2) years with the option to renew for three
(3) additional twelve-month periods. Contract renewal will be contingent upon
the mutual agreement of the City and the Contractor.
On July 9, 2014, request for proposals were mailed to thirty-seven vendors and
specifications were posted on the websites of the City and Georgia Procurement
Registry. The RFP has been advertised, opened and evaluated. Four (4)
proposals were received on August 8, 2014 from the following offerors:
Denny Enterprises (Fortson, GA)
Nolin Fence and Deck (Phenix City, AL)
Young Fencing Company (Columbus, GA)
?Georgia Fence Wholesale (Columbus, GA)
?Georgia Fence Wholesale did not provide the required Transmittal Letter,
Qualifications/Experience and business license information. The omitted
Qualifications/Experience information, which was necessary for the evaluation
process, consisted of a demonstration of the vendor?s access to adequate
equipment to provide the services, a demonstration of the vendor?s history of
completing projects on time and within budget, an indication of whether the
vendor has been involved in litigation against owners or engineering firms, and
detailed information to demonstrate the vendor has experienced personnel to
assign to future fencing projects.
In accordance with the RFP specifications, ?Firms shall be notified, in
writing, and shall have two (2) business days, after notification, to submit
the omitted information?: However, after numerous emails and calls to the
vendor, as of September 19, 2014 the Purchasing Division still had not received
the required information. Therefore, the vendor?s proposal was deemed
non-responsive. The Purchasing Division informed the owner, via email, that if
the omitted information was not received within two (2) days, the vendor?s
proposal would be deemed non-responsive.
The proposals were reviewed by the Evaluation Committee members, which
consisted of representatives from the Engineering Department, Public Works
Department and Parks & Recreation Department. Additional representatives from
the Parks & Recreation Department and Public Works Department served as
non-voting, advisory members of the committee.
The City?s Procurement Ordinance, Article 3-110, Competitive Sealed Proposals
for the procurement of Equipment, Supplies and Professional Services, governs
the RFP Process. During the process of an RFP there is no formal opening, due
to the possibility of negotiated components of the proposal. In the event
Council does not approve the recommended offeror, no proposal responses or any
negotiated components are made public until after the award of the contract.
If Council does not approve the recommended offeror, the RFP specifications may
be re-advertised. Additional information has been submitted to the City
Manager in a separate memo for information purposes.
Funds are budgeted each fiscal year for this ongoing expense, in various
accounts of the Engineering Department, Parks and Recreation Department, and
Public Works Department.
* * * * *
(B) TRAFFIC SIGNAL EQUIPMENT (ANNUAL CONTRACT) ? RFP NO. 14-0018
It is requested that Council approve the purchase of traffic signal equipment
from Temple, Inc., CDK Enterprises d/b/a Southern Lighting & Traffic, and
Utilicom Supply Associates, LLC, on an ?as needed basis?. The City will
purchase items from all three vendors in order of ranking: Temple, Inc.,
Southern Lighting & Traffic Systems and Utilicom Supply Associates, LLC.
Should more than one vendor have the item needed, the City shall have the right
to consider the proposed cost and availability of the item and select the best
option for the City regardless of the ranking. Consideration will also be
given to compatibility with existing equipment, and select the best option
regardless of the ranking or price.
The equipment will be utilized by the Traffic Division for construction and
maintenance of the signal systems. The traffic signal equipment includes
traffic signal controllers, cabinets signal conflicts monitors, loop detectors,
load switches, signal heads, concrete strain poles and many other related
components.
Contractors will furnish fully tested and operational traffic control
equipment. All traffic signal controllers and masters shall conform to the
Georgia Department of Transportation (DOT) and Caltrans Qualified Product
List.
The contract term shall be for one year, with the option to renew for four
additional twelve-month periods. Contract renewal is contingent upon the
mutual agreement of the City and the Contractor.
On April 25, 2014, request for proposals postcards were mailed to one hundred
twenty-five (125) vendors and specifications were posted on the websites of the
City, and Georgia Procurement Registry. The RFP has been advertised and
opened. Proposals were received on May 30, 2014, from the following three (3)
offerors:
Temple, Inc. (Decatur, AL)
Southern Lighting & Traffic Systems (Cumming, GA)
Utilicom Supply Associates, LLC (Norcross, GA)
The proposals were reviewed by the Evaluation Committee members, which
consisted of representatives from Public Works, Inspections & Code and Traffic
Engineering. Representatives from Traffic Engineering also served in advisory
positions and were non-voting members.
The RFP process is governed by the City?s Procurement Ordinance Article 3-110,
Competitive Sealed Proposals. During the process of an RFP there is no formal
opening, due to the possibility of negotiated components of the proposal. In
the event Council does not approve the recommended offeror, no proposal
responses or any negotiated components are made public until after the award of
the contract. If Council does not approve the recommended offeror (s), the RFP
specifications will be re-advertised. Evaluation results and cost proposals
have been submitted to the City Manager in a separate memo for informational
purposes.
Funds are budgeted each fiscal year for this on-going expense: General Fund -
Engineering - Traffic Engineering ? Operating Materials,
0101-250-2100-TRAF-6728; 1999 SPLOST Supported Paving Projects, Paving Fund
Supported Capital Projects and other various Capital Improvement Projects.
* * * * *
(C) MEDICAL EVALUATION SERVICES FOR THE FIRE/EMS DEPARTMENT (ANNUAL CONTRACT) -
RFP NO. 14-0019
It is requested that Council approve the contract for medical evaluation
services, for Fire/EMS, from SiteMed North America, LLC.
The services are needed to assist the Columbus Fire & EMS Department in
evaluating the physical condition of its firefighter workforce and to make
recommendations for a physical fitness program. The contractor will provide
medical evaluation services, for each member of the Columbus Fire & EMS
Department, which shall comply with all requirements prescribed in the most
current National Fire Protection Association (NFPA) 1201, Developing Fire
Protection Services for the Public, sections 7-2.4-2 and 7-2.2.4, NFPA 1582;
Standard on Medical Requirements for Firefighters and all other applicable
standards, guidelines, laws, regulations and acts. Approximately 358 personnel
will be examined, as needed, contingent upon budget appropriations.
The initial term of the contract shall be for two years, with the option to
renew for three additional twelve-month periods. The contract renewal will be
contingent upon the mutual agreement of the City and the Contractor.
On May 13, 2014, request for proposals postcards were mailed to fifty-nine (59)
vendors and specifications were posted on the websites of the City, DemandStar
and Georgia Procurement Registry. The RFP has been advertised and opened.
Proposals were received on June 6, 2014, from the following four (4) offerors:
SiteMed North America, LLC (Greenville, SC)
North Greenville Fitness and Cardiac Rehabilitation Clinic, Inc.
(Travelers Rest, SC)
Comprehensive Contingency Task Force (Columbus, GA)
Caduceus Occupational Medicine (Columbus, GA)
The proposal was reviewed by the Evaluation Committee, which consisted of
representatives from Human Resources and Columbus Fire/EMS Department. A
representative from Columbus Fire/EMS Department also served in advisory
position and was a non-voting member. The City?s Procurement Ordinance Article
3-110, Competitive Sealed Proposals for the procurement of Equipment, Supplies
and Professional Services, governs the RFP Process. During the RFP process,
there is no formal opening due to the possibility of negotiated components of
the proposal. In the event City Council does not approve the recommended
offeror, no proposal responses or any negotiated components are made public
until after the award of the contract. The cost information has been submitted
to the City Manager in a separate memo for informational purposes.
Funds are budgeted each fiscal year for this ongoing service: General Fund -
Fire/EMS Department, Special Operations - Pre-Employment Physical;
0101-410-2600-SPCO-6324.
* * * * *
(D) BLADE SERVERS AND SOFTWARE FOR VIRTUAL IMAGE STORAGE
It is requested that Council approve the purchase of five (5) blade servers and
applicable software, from IBM/CPak Technology Solutions, in the amount of
$69,870.00, via Georgia Statewide Contract, SWC90813-02.
The blade servers and software will be used to store virtual images. The
purchase of the equipment and software will allow for the replacement of
outdated personal computers with virtual devices.
Funds are budgeted in the FY15 Budget: General Fund ? Information Technology ?
Computer Equipment Maintenance; 0101-210-2000-ISS-6511.
* * * * *
(E) CONTRACT AMENDMENT TO ADD GOVERNMENT CENTER COMPLEX TO THE CONTRACT FOR
CONCESSIONAIRE SERVICES FOR PARKS AND RECREATION SPORTS FACILITIES (ANNUAL
CONTRACT) - RFP NO. 12-0019
It is requested that Council approve an amendment to the annual contract with
Chester?s Barbecue (Columbus, GA) for Concessionaire Services for Parks and
Recreation Sports Facilities, to add Concessionaire Services at the Government
Center Complex.
The Sol of Wa was awarded the contract to provide Concessionaire Services at
the Government Center Complex, per Resolution No. 201-12 (RFP No. 12-0019), on
July 10, 2012. On September 15, 2014, The Sol of Wa abruptly ceased providing
services and officially gave notice to cancel their contract as of September
30, 2014. The cessation of services caused an inconvenience for employees,
jurors and other citizens who frequent the City?s cafeteria. Therefore, in an
effort to continue the services at the Government Center with limited
interruption, the City requested Chester?s Barbecue to absorb these services,
since the vendor is already under contract, providing similar services as the
contractor providing Concessionaire Services for Parks & Recreation Sports
Facilities contract.
Chester?s Barbecue (Columbus, GA) was invited to tour the cafeteria and meet
with City Staff, including representative from the City Manager?s office and
Purchasing Division, to discuss the expectations for providing the services at
the Government Center. The vendor submitted a menu consisting of breakfast and
lunch items, as well as, beverages and other food items. City staff is
satisfied that the vendor?s menu and pricing is comparable to the menu and
pricing patrons of the cafeteria have come to expect, and Chester?s has agreed
to provide the concessionaire Services at the Government Center Complex.
Chester?s Barbecue (Columbus, GA) was the awarded the contract for
Concessionaire Services for Parks & Recreation Sports Facilities (Annual
Contract) on February 28, 2014 through February 27, 2016, with the option to
renew for three additional twelve-month periods. Therefore, the contract term
for the addition of the Government Center Complex will be the same.
The vendor will operate the cafeteria at their own expense.
* * * * * *
(F) MAINTENANCE, REPAIR & OPERATIONAL (MRO), SUPPLIES VIA U.S. COMMUNITIES
GOVERNMENTAL PURCHASING ALLIANCE
It is requested that Council approve the purchase of MRO supplies, on an as
needed basis, from HD Supply Facilities Maintenance, Ltd. (San Diego, CA)., via
contract number 11019, adopted by U.S. Communities Governmental Purchasing
Alliance (GPA). HD Supply Facilities Maintenance, Ltd. (San Diego, CA) will
be utilized as an alternate source for MRO supply purchases for various
departments.
U.S. Communities is the leading national government purchasing cooperative,
providing government procurement resources and solutions to local and state
government agencies, school districts (K-12), higher education institutes, and
nonprofits looking for the best overall supplier government pricing. Contract
Number Maricopa County, 11019, adopted by U.S. Communities Governmental
Purchasing Alliance, is a cooperative bid available for use by any governmental
entity. The City?s Procurement Ordinance, Article 9-101, authorizes the use of
cooperative purchasing.
The contract will remain in effect through July 31, 2017.
Funds are budgeted each fiscal year for this ongoing expense: Various
Departments ? Operating Materials; 6728.
* * * * * *
(G) ADDITIONAL CONSTRUCTION MANAGEMENT SERVICES FOR THE MUSCOGEE COUNTY PUBLIC
LIBARY
It is requested that Council authorize the extension of the construction
management contract with Aaron & Clements, Inc. (Columbus, GA), formerly Newton
Aaron & Associates, Inc., in the amount of $5,600 plus out-of-pocket expenses,
for the remaining 1999 SPLOST expenditures for the Muscogee County Public
Library. The remaining 1999 SPLOST expenditures are shown in the below
document:
Per Resolution No. 583-02, Council authorized the execution of a contract with
Newton Aaron & Associates, Inc., for construction management services of the
Library. The contract was extended, per Resolution No. 141-10, to include
construction management services for the Asphalt Removal, Grassing and
Plantings project at the Columbus Library
This proposed extension of the construction management contract is per
authorization from the Muscogee County Library Board meetings of May 22, 2014
and June 16, 2014; and October 2, 2014 correspondence between the director of
the Chattahoochee Valley Libraries and Aaron & Clements, Inc.
Funds are budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library Project.
* * * * * *
(H) ADDITIONAL CONSTRUCTION SERVICES AND FF&E FOR THE MUSCOGEE COUNTY PUBLIC
LIBRARY
It is requested that Council authorize the extension of the contract with
Batson-Cook Company (West Point, GA) for additional construction services and
FF&E for the Muscogee County Public Library. Batson-Cook Company will perform
construction and purchasing activities in the amount of $218,421.00. The
following are the fees for Batson-Cook Company.
? The fee will be 2.5% of the cost of the work
? General office overhead will be 5%
? Labor will be billed based billing rates as dictated by the type of work that
is ongoing.
Per Resolution No. 72-03, Council authorized the execution of a negotiated
contract with Batson-Cook Company for construction of the Library. The
$218,421.00 construction and related items are itemized on the attached
remaining 1999 SPLOST expenditures:
This proposed extension of the construction management contract is per
authorization from the Muscogee County Library Board meetings of May 22, 2014
and June 16, 2014.
Funds are budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library Project.
* * * * * *
(I) ADDITIONAL BOOKS AND OTHER MEDIA FOR THE MUSCOGEE COUNTY PUBLIC LIBRARY
It is requested that Council authorize the extension of the contract with
Brodart Books & Library Services (Williamsport, PA) for additional books and
other media for the Muscogee County Public Library in the amount of $29,914.17.
The fees and discounts for the additional books and other media are shown in
the attached letter from Brodart Books & Library Services to the director of
the Chattahoochee Valley Library:
Per Resolution No. 69-04, Council authorized the execution of a negotiated
contract with Brodart Books & Library Services for materials and services for
the Library. The $29,914.17 line item for books is listed on the attached
remaining 1999 SPLOST expenditures:
Funds are budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library Project.
?ITEM A?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXECUTION OF AN ANNUAL CONTRACT WITH
DENNY ENTERPRISES (FORTSON, GA), NOLIN FENCE AND DECK (PHENIX CITY, AL) AND
YOUNG FENCING COMPANY (COLUMBUS, GA) FOR THE INSTALLATION OR REPLACEMENT OF
FENCING THROUGHOUT COLUMBUS-MUSCOGEE COUNTY ON AN AS-NEEDED BASIS.
WHEREAS, an RFP was administered (RFP No. 15-0001) and proposals were received
from four offerors; and,
WHEREAS, the proposal submitted by Denny Enterprises, Nolin Fence and
Deck, and Young Fencing Company were evaluated most responsive to the RFP; and,
WHEREAS, the term of contract shall be for two years with the option to
renew for three additional twelve-month periods. Contract renewal will be
contingent upon the mutual agreement of the City and the Contractor.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to execute an annual
contract with Denny Enterprises (Fortson, GA), Nolin Fence and Deck (Phenix
City, AL) and Young Fencing Company (Columbus, GA) for the installation or
replacement of fencing throughout Columbus-Muscogee County on an as-needed
basis. Funds are budgeted each fiscal year for this ongoing expense, in
various accounts of the Engineering Department, Parks and Recreation Department
and Public Works Department.
_____________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of __________, 2014 and adopted at said meeting by the
affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM B?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT WITH TEMPLE, INC.,
SOUTHERN LIGHTING & TRAFFIC SYSTEMS AND UTILICOM SUPPLY ASSOCIATES, LLC TO
PROVIDE TRAFFIC SIGNAL EQUIPMENT TO BE PURCHASED ON AN ?AS NEEDED BASIS?.
WHEREAS, an RFP was administered (RFP No. 14-0018) and three proposals were
received; and,
WHEREAS, the proposals submitted by Temple, Inc., Southern Lighting & Traffic
Signals and Utilicom Supply Associates, LLC met the proposal requirements and
were evaluated responsive to the RFP; and,
WHEREAS, the term of contract shall be for one year, with the option to renew
for four additional twelve-month periods. Contract renewal is contingent upon
the mutual agreement of the City and the Contractor.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to execute a contract with
Temple, Inc., Southern Lighting & Traffic Systems and Utilicom Supply
Associates, LLC for traffic signal equipment to be purchased on an ?as needed
basis?. Funds are budgeted each fiscal year for this on-going expense, General
Fund ? Engineering - Traffic Engineering ? Operating Materials,
0101-250-2100-TRAF-6728; 1999 SPLOST Supported Paving Projects and Paving Fund
Supported Capital Projects and other various Capital Improvement Projects.
_________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of ____________________, 2014 and adopted at said
meeting by the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_______________________________ _________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM C?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT WITH SITEMED NORTH
AMERICA, LLC TO PROVIDE MEDICAL EVALUATION SERVICES FOR COLUMBUS FIRE/EMS
DEPARTMENT.
WHEREAS, an RFP was administered (RFP No. 14-0019) and four proposals were
received; and,
WHEREAS, the proposal submitted by SiteMed North America, LLC met all proposal
requirements and was evaluated responsive to the RFP; and,
WHEREAS, the initial term of the contract shall be for two years, with
the option to renew for three (3) additional twelve-month periods. The
contract renewal will be contingent upon the mutual agreement of the City and
the Contractor.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to execute a contract with SiteMed
North America, LLC for medical evaluation services for the Columbus Fire/EMS
Department. Funds are budgeted each fiscal year for this ongoing expense:
General Fund - Fire/EMS Department - Special Operations - Pre-Employment
Physicals; 0101-410-2600-SPCO-6324.
____________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of _____________, 2014 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM D?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE PURCHASE OF FIVE (5) BLADE SERVERS AND
APPLICABLE SOFTWARE, FROM IBM/CPAK TECHNOLOGY SOLUTIONS, IN THE AMOUNT OF
$69,870.00, VIA GEORGIA STATEWIDE CONTRACT, SWC90813-02.
WHEREAS, the blade servers and software will be used to store virtual images.
The purchase of the equipment and software will allow for the replacement of
outdated personal computers with virtual devices.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS
FOLLOWS:
That the City Manager is hereby authorized to purchasefive (5) blade
servers and applicable software, from IBM/CPak Technology Solutions, in the
amount of $69,870.00, via Georgia Statewide Contract, SWC90813-02. Funds are
budgeted in the FY15 Budget: General Fund ? Information Technology ? Computer
Equipment Maintenance; 0101-210-2000-ISS-6511.
_______________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of ____________________, 2014 and adopted at said
meeting by the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
______________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM E?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE AMENDMENT TO THE ANNUAL CONTRACT WITH CHESTER?S
BARBECUE (COLUMBUS, GA) FOR CONCESSIONAIRE SERVICES FOR PARKS AND RECREATION
SPORTS FACILITIES, TO ADD CONCESSIONAIRE SERVICES AT THE GOVERNMENT CENTER
COMPLEX.
WHEREAS, the Sol of Wa was awarded the contract to provide
Concessionaire Service at the Government Center Complex, per Resolution No.
201-12 (RFP No. 12-0019), on July 10, 2012. On September 15, 2014, The Sol of
Wa abruptly ceased providing services and officially gave notice to cancel
their contract as of September 30, 2014. The cessation of services caused an
inconvenience for employees, jurors and other citizens who frequent the City?s
cafeteria; and,
WHEREAS, Chester?s Barbecue (Columbus, GA) was invited to tour the cafeteria
and meet with City Staff, including representative from the City Manager?s
office and Purchasing Division, to discuss the expectations for providing the
services at the Government Center. The vendor submitted a menu consisting of
breakfast and lunch items, as well as, beverages and other food items. City
staff is satisfied that the vendor?s menu and pricing is comparable to the menu
and pricing patrons of the cafeteria have come to expect, and Chester?s has
agreed to provide the concessionaire Services at the Government Center Complex.
WHEREAS, Chester?s Barbecue (Columbus, GA) was the awarded the contract for
Concessionaire Services for Parks & Recreation Sports Facilities (Annual
Contract) on February 28, 2014 through February 27, 2016, with the option to
renew for three additional twelve-month periods. Therefore, the contract term
for the addition of the Government Center Complex will be the same.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS
FOLLOWS:
That the City Manager is hereby authorized to amend the annual contract
with Chester?s Barbecue (Columbus, GA) for Concessionaire Services for Parks &
Recreation Sports Facilities, to add Concessionaire Services at the Government
Center Complex. The vendor will operate the cafeteria at their own expense.
____________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of _________________, 2014 and adopted at said meeting
by the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ _________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM F?
A RESOLUTION
NO. _________
A RESOLUTION AUTHORIZING THE PURCHASE OF MAINTENANCE, REPAIR &
OPERATIONAL (MRO) SUPPLIES, FROM HD SUPPLY FACILITIES, LTD. (SAN DIEGA, CA),
VIA CONTRACT NUMBER 11019, ADOPTED BY U.S. COMMUNITIES GOVERNMENTAL PURCHASING
ALLIANCE (GPA). HD SUPPLY FACILITIES, LTD WILL BE UTILIZED AS AN ALTERNATE
SOURCE FOR MAINTENANCE, REPAIR & OPERATIONAL (MRO), SUPPLIES PURCHASES FOR
VARIOUS DEPARTMENTS.
WHEREAS, U.S. Communities is the leading national government purchasing
cooperative, providing government procurement resources and solutions to local
and state government agencies, school districts (K-12), higher education
institutes, and nonprofits looking for the best overall supplier government
pricing; and,
WHEREAS, contract number 11019, adopted by U.S. Communities Governmental
Purchasing Alliance, is a cooperative bid available for use by any governmental
entity. The City?s Procurement Ordinance, Article 9-101, authorizes the use of
cooperative purchasing; and,
WHEREAS, the contract will remain in effect through July 31, 2017.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to purchase MRO Supplies
from HD Supply Facilities Maintenance, Ltd. (San Diego, CA) via contract number
11019, adopted by U.S. Communities Governmental Purchasing Alliance (GPA). HD
Supply Facilities Maintenance, Ltd. will be utilized as an alternate source for
MRO supply purchases for various departments. Funds are budgeted each fiscal
year for this ongoing expense: Various Departments ? Operating Materials; 6728.
______________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of _____________, 2014 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM G?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXTENSION OF THE CONSTRUCTION MANAGEMENT
CONTRACT WITH AARON & CLEMENTS (COLUMBUS, GA), FORMERLY NEWTON AARON &
ASSOCIATES, INC., IN THE AMOUNT OF $5,600 PLUS OUT-OF-POCKET EXPENSES, FOR THE
REMAINING 1999 SPLOST EXPENDITURES FOR THE MUSCOGEE COUNTY PUBLIC LIBRARY.
WHEREAS, per Resolution No. 583-02, Council authorized the execution of a
contract with Newton Aaron & Associates, Inc., for construction management
services of the Library. The contract was extended, per Resolution No. 141-10,
to include construction management services for the Asphalt Removal, Grassing
and Plantings project at the Columbus Library; and,
WHEREAS, this proposed extension of the construction management
contract is per authorization from the Muscogee County Library Board meetings
of May 22, 2014 and June 16, 2014; and October 2, 2014 correspondence between
the director of the Chattahoochee Valley Libraries and Aaron & Clements, Inc.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS
FOLLOWS:
That the City Manager is hereby authorized to extend the construction
management contract with Aaron & Clements, Inc. (Columbus, GA), formerly Newton
Aaron & Associates, Inc., in the amount of $5,600 plus out-of-pocket expenses,
for the remaining 1999 SPLOST expenditures for the Muscogee County Public
Library. Funds are budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library Project.
___________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of ____________________, 2014 and adopted at said
meeting by the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ _________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM H?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXTENSION OF THE CONTRACT WITH BATSON-COOK
COMPANY (WEST POINT, GA) FOR ADDITIONAL CONSTRUCTION SERVICES AND FF&E FOR THE
MUSCOGEE COUNTY PUBLIC LIBRARY. BATSON-COOK COMPANY WILL PERFORM CONSTRUCTION
AND PURCHASING ACTIVS IN THE AMOUNT OF $218,421.00.
WHEREAS, the following are the fees for Batson-Cook Company:
? The fee will be 2.5% of the cost of the work
? General office overhead will be 5%
? Labor will be billed based billing rates as dictated by the type of work that
is ongoing; and,
WHEREAS, per Resolution No. 72-03, Council authorized the execution of
a negotiated contract with Batson-Cook Company for construction of the
Library. This proposed extension of the construction management contract is
per authorization from the Muscogee County Library Board meetings of May 22,
2014 and June 16, 2014.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS
FOLLOWS:
That the City Manager is hereby authorized to extend the contract with
Batson-Cook Company (West Point, GA) for additional construction services and
FF&E for the Muscogee County Public Library. Batson-Cook Company will perform
construction and purchasing activities in the amount of $218,421.00. Funds are
budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library Project.
_____________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of ___________, 2014 and adopted at said meeting by the
affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_______________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
?ITEM I?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXTENSION OF THE CONTRACT WITH BRODART
BOOKS & LIBRARY SERVICES (WILLIAMSPORT, PA) FOR ADDITIONAL BOOKS AND OTHER
MEDIA FOR THE MUSCOGEE COUNTY PUBLIC LIBRARY IN THE AMOUNT $29,914.17.
WHEREAS, per Resolution No. 69-04, Council authorized the execution of a
negotiated contract with Brodart Books & Library Services for materials and
services for the Library.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS
FOLLOWS:
That the City Manager is hereby authorized to extend the contract with
Brodart Books & Library Services (Williamsport, PA) for additional books and
other media for the Muscogee County Public Library in the amount of
$29,914.17. Funds are budgeted in FY15 Budget, 1999 SPLOST ? MCSD Library
Project.
________________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of ____________, 2014 and adopted at said meeting by the
affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Baker voting __________.
Councilor Barnes voting __________.
Councilor Davis voting .
Councilor Henderson voting __________.
Councilor Huff voting __________.
Councilor McDaniel voting __________.
Councilor Thomas voting __________.
Councilor Turner Pugh voting __________.
Councilor Woodson voting __________.
_____________________________ ________________________
Tiny B. Washington, Clerk of Council Teresa Pike Tomlinson, Mayor
Attachments