(A) OSCEOLA COURT-MUSCOGEE TECHNOLOGY PARK ? RFB NO. 06-0022
It is requested that Council authorize the execution of a construction contract
with Robinson Paving Company, in the amount of $525,352.50, for the
construction of Osceola Court in the Muscogee County Technology Park.
The contractor will be required to maintain public access to all residences and
businesses located within the project area. All work pertaining to the
construction project shall be performed in accordance with the State of
Georgia, Department of Transportation ? Standard Specifications, Construction
of Roads and Bridges, 1993 Edition or as amended.
Bid specifications were faxed to area construction companies that provide such
services, and specifications were posted on the City?s website. Three bid
responses were received on November 16, 2005. This bid has been advertised,
opened and reviewed. The bidders were:
CONTRACTOR TOTAL BID DBE PARTICIPATION
Robinson Paving Company
(Columbus, GA) $525,352.50 5.00%
Mc-Math Turner Construction
(Columbus, GA) 527,793.38 10.00%
Alexander Contracting Company (Columbus, GA) 546,056.01 3.40%
Funds are budgeted in FY06 Budget, 1999 Sales Tax Project Fund ? NFL
Improvements, Drainage/Street Improvements; 0540-695-2133-TXNF-7622-50601-20040.
* * * * * * *
(B) EMERGENCY PURCHASE OF HOT WATER HEATER
It is requested that Council approve payment for the emergency purchase of a
hot water heater, for the Muscogee County Jail, from Hajoca (Columbus, Georgia)
in the amount of $26,498.00.
On September 26, 2005, the City Manager approved the emergency purchase of a
600-gallon water heater to replace the inoperable water heater at the jail.
The old water heater burst and had to be replaced immediately as it is utilized
around the clock. To diminish the cost and length of time the water heater
would be down, the inoperable A.O. Smith water heater was replaced with a new
water heater by the same manufacturer, therefore, no new fittings were required
to be installed. Hajoca is the only known source for A.O. Smith Water Heaters
who could provide immediate service.
Funding is available in the FY06 Budget: Public Services ? Other
Maintenance/Repairs ? Building Maintenance/Public Safety-Muscogee County Jail;
0101-260-3710-REPA-6528.25.
* * * * * * *
(C) EMERGENCY CONSTRUCTION REPAIRS AT THE RIVERWALK
It is requested that Council approve payment to Gerald Brooks Construction
Company in the amount of $21,400.00, for emergency construction repairs
required at the Riverwalk.
Repair work was required at the Riverwalk Entrance at the West end of 10th
Street. Damage occurred at the Riverwalk when a citizen?s vehicle crashed
into existing brick columns, wall and metal railing. Additional repairs to
other areas of the Riverwalk were necessary to correct damage that occurred
during river flooding. Damaged sections of the Riverwalk included: dislodged
pre-cast concrete coping, obstructing pedestrian traffic; various sections of
dislodged brick veneer and damaged safety railings. The Riverwalk is a
pedestrian walkway used on a daily basis. Damaged concrete, brick and metal
railing components strewn along the walkway were considered hazardous to
pedestrians. Damaged areas were also subject to further damage upon
encountering another River flood. Therefore, the City Manager determined that
the situation warranted an emergency purchase of the repairs.
Gerald Brooks Construction Company was selected because the firm constructed
the last section of the Riverwalk and was knowledgeable about selecting the
correct materials and products to match the original specifications.
Funding is available in the FY06 Budget: General Fund Supported Capital
Projects ? Capital Expenditures Over $5,000 ? Riverwalk Flood Cleanup;
0508-660-1000-CPGF-7761-22209-20040-0.
* * * * * * *
(D) UPGRADE OF SECURITY MONITORING SYSTEM AT MUSCOGEE COUNTY PRISON
It is requested that Council approve the purchase of an upgrade for the
security monitoring system at Muscogee County Prison from South Western
Communications, Inc., (Decatur, Al) in the amount of $40,830.00.
The original security monitoring system was installed by South Western
Communications when the prison was built 10 years ago. The vendor also
repaired the system when the Prison experienced a lightening strike earlier
this year. However, due to the age and technology of the current system, it is
more cost effective at time to upgrade the existing system. The video screens
of the system are not working properly, and the video recording function has
not worked for some time. Currently, when officers are required to go on the
inmate floors, there is a possibility that the officer cannot be seen, because
the video screens may not be working. This presents a serious security issue
for the prison staff. The new system will include digital video recording,
multi-screen monitoring in the North and South Towers and camera replacements.
The purchase is considered an only known source because South Western installed
the original system.
Funding is available in the FY06 budget: Columbus Building Authority Series
2001 ? Communications Equipment ? Security/Safety Enhancements;
0553-200-2436-CBA-7733-40207-20010.
* * * * * * *
(E) COMPUTER ROOM COOLING EQUIPMENT ? RFB NO. 06-0029
It is requested that Council authorize the execution of a contract with Indoor
Solutions HVAC, Inc., in the amount of $37,044, to provide and install computer
room cooling equipment for the Information Technology Department. The vendor
will remove the existing water-cooled computer room unit, cooling tower and
centrifugal pump, and replace with new equipment. Additionally, the vendor
will provide temporary cooling during the removal of the old equipment and the
installation of the new equipment.
Nineteen bid invitations were faxed, and specifications were posted on the
City?s website. A Mandatory Pre-Bid Conference / Site Visit was held on
November 8, 2005; seven vendors attended. Two bid responses were received on
November 16, 2005. This bid has been advertised, opened and reviewed. The
bidders were:
VENDORS BID AMOUNT
Indoor Solutions HVAC, Inc.
(Columbus, GA) $37,044.00
Holbrook Service Company, Inc.
(Columbus, GA) 45,825.00
Funding is available from the FY06 Budget, Non-Categorical Expenses - Capital
Expenditures Over $5000; 0101-590-3000-NCAT-7761.
* * * * * * * *
(F) ELECTION SUPPORT SERVICES EXPENSES
It is requested that Council approve payment to Diebold (McKinney, TX) in the
amount of $27,601.49 for election support services expenses.
The services are needed to ensure the accurate operation of the voting system,
which includes Program & Printing, Logic & Accuracy, and Flash Memory cards.
Diebold Election Systems is the provider mandated by the State for the support
services. Therefore, the vendor is considered an only known source.
Funding is available in FY06 Budget; Boards and Commissions, Elections &
Registration ? Election Expenses; 0101-290-2000-ELCT-6355.
?ITEM A?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXECUTION OF A CONSTRUCTION CONTRACT WITH ROBINSON
PAVING COMPANY, IN THE AMOUNT OF $525,352.50, FOR THE CONSTRUCTION OF OSCEOLA
COURT IN THE MUSCOGEE COUNTY TECHNOLOGY PARK.
WHEREAS, the contractor will be required to maintain public access to all
residences and businesses located within the project area. All work
pertaining to the construction project shall be performed in accordance with
the State of Georgia, Department of Transportation ? Standard Specifications,
Construction of Roads and Bridges, 1993 Edition or as amended.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to execute a construction
contract with Robinson Paving Company, in the amount of $525,352.50, for the
construction of Osceola Court in the Muscogee County Technology Park. Funds
are budgeted in FY06 budget, 1999 Sales Tax Project Fund ? NFL Improvements,
Drainage/Street Improvements; 0540-695-2133-TXNF-7622-50601-20040.
____________________________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of __________________, 2005 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
?ITEM B?
A RESOLUTION
NO._________
A RESOLUTION AUTHORIZING PAYMENT FOR THE EMERGENCY PURCHASE OF A HOT
WATER HEATER, FOR THE MUSCOGEE COUNTY JAIL, FROM HAJOCA (COLUMBUS, GEORGIA) IN
THE AMOUNT OF $26,498.00.
WHEREAS, on September 26, 2005, the City Manager approved the emergency
purchase of a 600-gallon water heater to replace the inoperable water heater at
the jail. The old water heater burst and had to be replaced immediately as it
is utilized around the clock. To diminish the cost and length of time the
water heater would be down, the inoperable A.O. Smith water heater was replaced
with a new water heater by the same manufacturer, therefore, no new fittings
were required to be installed. Hajoca is the only known source for A.O. Smith
Water Heaters who could provide immediate service.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to make payment to Hajoca
(Columbus, Georgia) in the amount of $26,498.00 for the emergency purchase of a
hot water heater at the Muscogee County Jail. Funding is available in the FY06
Budget: Public Services ? Other Maintenance/Repairs ? Building
Maintenance/Public Safety-Muscogee County Jail; 0101-260-3710-REPA-6528.25.
______________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of __________________, 2005 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
?ITEM C?
A RESOLUTION
NO._________
A RESOLUTION AUTHORIZING PAYMENT TO GERALD BROOKS CONSTRUCTION COMPANY,
IN THE AMOUNT OF $21,400.00, FOR EMERGENCY CONSTRUCTION REPAIRS REQUIRED AT THE
RIVERWALK.
WHEREAS, repair work was required at the Riverwalk Entrance at the West
end of 10th Street. Damage occurred at the Riverwalk when a citizen?s vehicle
crashed into existing brick columns, wall and metal railing. Additional
repairs to other areas of the Riverwalk were necessary to correct damage that
occurred during river flooding. Damaged sections of the Riverwalk included:
dislodged pre-cast concrete coping, obstructing pedestrian traffic; various
sections of dislodged brick veneer and damaged safety railings. The Riverwalk
is a pedestrian walkway used on a daily basis. Damaged concrete, brick and
metal railing components strewn along the walkway were considered hazardous to
pedestrians. Damaged areas were also subject to further damage upon
encountering another River flood. Therefore, the City Manager determined that
the situation warranted an emergency purchase of the repairs.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to render payment to Gerald Brooks
Construction Company, in the amount of $21,400.00, for emergency construction
repairs required at the Riverwalk. Funding is available in the FY06 Budget:
General Fund Supported Capital Projects ? Capital Expenditures Over $5,000 ?
Riverwalk Flood Cleanup; 0508-660-1000-CPGF-7761-22209-20040-0.
______________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of __________________, 2005 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
?ITEM D?
A RESOLUTION
NO._________
A RESOLUTION AUTHORIZING THE PURCHASE OF AN UPGRADE FOR THE SECURITY MONITORING
SYSTEM AT MUSCOGEE COUNTY PRISON FROM SOUTH WESTERN COMMUNICATIONS, INC.,
(DECATUR, AL) IN THE AMOUNT OF $40,830.00.
WHEREAS, the original security monitoring system was installed by South
Western Communications when the prison was built 10 years ago. The vendor also
repaired the system when the Prison experienced a lightening strike earlier
this year. However, due to the age and technology of the current system, it is
more cost effective at time to upgrade the existing system. The video screens
of the system are not working properly, and the video recording function has
not worked for some time. Currently, when officers are required to go on the
inmate floors, there is a possibility that the officer cannot be seen, because
the video screens may not be working. This presents a serious security issue
for the prison staff; and,
WHEREAS, the new system will include digital video recording,
multi-screen monitoring in the North and South Towers and camera replacements.
The purchase is considered an only known source because South Western installed
the original system.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to purchase an upgrade for the
security monitoring system at Muscogee County Prison from South Western
Communications, Inc., (Decatur, Al) in the amount of $40,830.00. Funding is
available in the FY06 Budget: Columbus Building Authority Series 2001 ?
Communications Equipment ? Security/Safety Enhancements;
0553-200-2436-CBA-7733-40207-20010.
______________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of __________________, 2005 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
?ITEM E?
A RESOLUTION
NO.______
A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT WITH INDOOR SOLUTIONS
HVAC, INC., IN THE AMOUNT OF $37,044, TO PROVIDE AND INSTALL COMPUTER ROOM
COOLING EQUIPMENT FOR THE INFORMATION TECHNOLOGY DEPARTMENT.
WHEREAS, the vendor will remove the existing water-cooled computer room unit,
cooling tower and centrifugal pump, and replace with new equipment.
Additionally, the vendor will provide temporary cooling during the removal of
the old equipment and the installation of the new equipment.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to execute with Indoor
Solutions HVAC, Inc., in the amount of $37,044, to provide and install computer
room cooling equipment for the Information Technology Department. Funding is
available from the FY06 Budget, Non-Categorical Expenses - Capital Expenditures
Over $5000; 0101-590-3000-NCAT-7761.
__________________________________
Introduced at a regular meeting of the Council of Columbus, Georgia,
held the _________ day of __________________, 2005 and adopted at said meeting
by the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
?ITEM F?
A RESOLUTION
NO._________
A RESOLUTION AUTHORIZING PAYMENT TO DIEBOLD (MCKINNEY, TX) IN THE
AMOUNT OF $27,601.49 FOR ELECTION SUPPORT SERVICES EXPENSES.
WHEREAS, the services are needed to ensure the accurate operation of
the voting system, which includes Program & Printing, Logic & Accuracy, and
Flash Memory cards. Diebold Election Systems is the provider mandated by the
State for the support services. Therefore, the vendor is considered an only
known source.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to render payment to Diebold
(McKinney, TX) in the amount of $27,601.49 for election support services
expenses. Funding is available in FY06 Budget; Boards and Commissions,
Elections & Registration ? Election Expenses; 0101-290-2000-ELCT-6355.
______________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of __________________, 2005 and adopted at said meeting by
the affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________.
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
__________________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert S. Poydasheff, Mayor
DATE: December 13, 2005
TO: Mayor and Councilors
FROM: Angela Cole, Director of Finance
SUBJECT: Advertised Bids
December 14, 2005
1. Heritage Park Fountain Maintenance (Annual Contract) ? RFB No. 06-0031
Scope of Bid
Establish an annual contract with a qualified contractor for cleaning
(skimming, vacuuming, cleaning the pit and adding chemicals as needed) and
maintaining jumping jets on a weekly basis. The term of contract shall be for
two years, with the option to renew for three (3) additional twelve-month
periods. Contract renewal shall be contingent upon the mutual agreement of the
City and the Contractor.
2. HVAC Controls Repair/Replacement (Annual Contract) ? RFB No. 06-0032
Scope of Bid
Provide repair/replacement on HVAC controls on an ?as needed basis?.
Contractor will provide service for electric and pneumatic controls on the HVAC
systems at various City buildings. The term of contract shall be for two
years, with the option to renew for three (3) additional twelve-month periods.
Contract renewal shall be contingent upon the mutual agreement of the City and
the Contractor.
3. Three (3) Color Photocopiers (Annual Contract) ? RFB No 06-0033
Scope of Bid
Provide, repair and maintain three (3) color photocopiers; one (1) for the
Print Shop and two (2) for Geographic Information System (GIS) located in the
Government Center Annex. The minimum contract term shall be for sixty (60)
months. The contract will be automatically renewed (without the need for any
further action) every 12 months until the end of such 60-month term.
4. 30'/35' Low Floor Clean Diesel Transit Buses (Annual Contract) ? RFB No.
06-0027
Scope of Bid
The successful vendor will provide 30'/35' low floor clean diesel transit buses
to METRA on an ?as needed? basis. The City anticipates purchasing
approximately 12 buses over a four (4) year period.
December 19, 2005
1. Standing Boy Bridge Replacement / Cusseta Road Bridge Repairs Over Bull
Creek ? RFB No. 06-0041
A Mandatory Pre-Bid Conference will be held at 3:00 PM (Eastern) on Monday,
December 19, 2005. Vendors shall convene in the conference room of the Finance
Department / Purchasing Division, which is located on the 5th Floor of the
Government Center, 100 Tenth Street, Columbus, GA, 31901. Vendors will be
allowed a 10-minute grace period. Any vendor who is not present in the
conference room of the Finance Department / Purchasing Division within 10
minutes after the time slated for the beginning of the mandatory pre-bid
conference shall not be allowed to participate any further in the bid process.
December 21, 2005
1. Construction of Pine Grove Municipal Solid Waste Landfill Phase 3: Cells
3A, 3B, 3C, 3D, 3E, 3F ? RFB No. 06-0034
Scope of Bid
The Project consists of the following major elements: approximately 357,000
cubic yards of cut material; 72,000 cubic yards of structural fill; placement
of 24-inch thick liner base with permeability not to exceed 1 x 10-7 cm/sec,
and placement of either a 24-inch thick leachate collection layer with a
permeability no less than 1 x 10-2 cm/sec or placement of geonet and 24-inches
of a soil layer with no specified permeability; a 60 mil HDPE geomembrane liner
over 14 acres; the construction of 1,400 feet of 24-foot gravel access road;
construction of a sediment basin; installation of erosion control devices;
installation of underdrain and leachate collection piping; and leachate pump
station and force main. Bids will be accepted only from Pre-Qualified Bidders.
2. Refuse Collection Truck Cab & Chassis ? RFB No. 06-0036
Scope of Bid
Provide four (4) refuse collection truck cab & chassis to be used by the Solid
Waste Collection Division of the Public Services Department.
3. Low Boy Tri-Axle Trailer (Re-Bid) ? RFB No. 06-0037
Scope of Bid
Provide one (1) low boy tri-axle trailer to be used by the Street Improvements
of the Public Services Department.
January 11, 2006
1. Standing Boy Bridge Replacement / Cusseta Road Bridge Repairs Over Bull
Creek ? RFB No. 06-0041
The work shall consist of bridge improvements to the Cusseta Road
Bridge and the Standing Boy Road Bridge, all in accordance with the designated
plans and specifications. The Contractor shall be required to maintain public
access to all residences and businesses located within the project area.