Columbus, Georgia
Georgia's First Consolidated Government
Post Office Box 1340
Columbus, Georgia, 31902-1340
(706) 653-4013
fax (706) 653-4016
Council Members
COUNCIL OF COLUMBUS, GEORGIA
November 22, 2005
AGENDA 9:00 A.M.
MAYOR ROBERT S. POYDASHEFF, PRESIDING
INVOCATION: Mayor Pro Tem Jack Rodgers
PLEDGE OF ALLEGIANCE: Mayor Robert S. Poydasheff
MINUTES OF PREVIOUS MEETING: Minutes of the September 6, 2005 Meeting of
the Council of the Consolidated Government of Columbus, Georgia.
____________________________________________________________
CONSENT AGENDA
(1) UNUSED SICK LEAVE PAYMENT:
Authorization is requested to pay employees for unused sick leave in
accordance with Section 16B-15-6(2) of the Columbus Ordinance. An agenda
report and resolution are attached.
(2) GEORGIA EMERGENCY MANAGEMENT AGENCY - GRANT:
Authorization is requested to accept $1,623,600 in grant funds from The
Georgia Emergency Management Agency (GEMA) to assist with emergency sheltering
cost for Hurricane Katrina Evacuees. An agenda report and resolution are
attached.
NON-ENCLOSURES, ACTION REQUESTED:
(3) Two New Zoning Petitions:
(a) Petition submitted by Mark Alexander to rezone approximately 10 acres of
property located at Schomburg Road, southeast of the main entrance to Maple
Ridge Subdivision from SFR1 (Single Family Residential 1) & RE1 (Residential
Estate 1) Districts to RO (Residential-Office) District. (Recommended for
approval by both the Planning Advisory Commission and the Planning Division.)
(63-A-05-Alexander)
(b) Petition submitted by George C. Woodruff Company to rezone approximately
14.85 acres of property located at 6939 Warm Springs Road from SFR1 District
(Single Family Residential 1) to SFR2 District (Single Family Residential 2).
(Recommended for conditional approval by both the Planning Advisory Commission
and the Planning Division.) (64-CA-05-George C. Woodruff Co.)
CONSENT AGENDA
11/22/2005
Page 2
Bid Advertisement
(Scheduled bid opening dates)
November 30, 2005
1. 30'/35' Low Floor Clean Diesel Transit Buses (Annual Contract) ? RFB
No. 06-0027
Scope of Bid
The Consolidated Government of Columbus, Georgia (the City) is seeking vendors
to provide 30'/35' low floor clean diesel transit buses to METRA on an ?as
needed? basis. The City anticipates purchasing approximately 12 buses over a
four (4) year period.
December 7, 2005
1. Trees for Planting on City?s Right-Of-Ways ? RFB No. 06-0035
Scope of Bid
Provide approximately 700 trees for planting on City?s Right-Of-Ways.
2. ? Ton Extended Cab Pick-up Cab & Chassis ? RFB No. 06-0030
Scope of Bid
Provide three (3) ? Ton extended cab pick-up cab and chassis to be used
by the Special Enforcement Division of the Public Services Department.
December 14, 2005
1. Heritage Park Fountain Maintenance (Annual Contract) ? RFB No. 06-0031
Scope of Bid
Establish an annual contract with a qualified contractor for cleaning
(skimming, vacuuming, cleaning the pit and adding chemicals as needed) and
maintaining jumping jets on a weekly basis. The term of contract shall be for
two years, with the option to renew for three (3) additional twelve-month
periods. Contract renewal shall be contingent upon the mutual agreement of the
City and the Contractor.
2. HVAC Controls Repair/Replacement (Annual Contract) ? RFB No. 06-0032
Scope of Bid
Provide repair/replacement on HVAC controls on an ?as needed basis?.
Contractor will provide service for electric and pneumatic controls on the HVAC
systems at various City buildings. The term of contract shall be for two
years, with the option to renew for three (3) additional twelve-month periods.
Contract renewal shall be contingent upon the mutual agreement of the City and
the Contractor.
CONSENT AGENDA
11/22/2005
Page 3
Bid Advertisement
(Scheduled bid opening dates)
(continue)
3. (3) Color Photocopiers (Annual Contract) ? RFB No 06-0033
Scope of Bid
Provide, repair and maintain three (3) color photocopiers; one (1) for the
Print Shop and two (2) for Geographic Information System (GIS) located in the
Government Center Annex. The minimum contract term shall be for sixty (60)
months. The contract will be automatically renewed (without the need for any
further action) every 12 months until the end of such 60-month term.
December 21, 2005
1. Construction of Pine Grove Municipal Solid Waste Landfill Phase 3:
Cells 3A, 3B, 3C, 3D, 3E, 3F ? RFB No. 06-0034
Scope of Bid
The Project consists of the following major elements: approximately 357,000
cubic yards of cut material; 72,000 cubic yards of structural fill; placement
of 24-inch thick liner base with permeability not to exceed 1 x 10-7 cm/sec,
and placement of either a 24-inch thick leachate collection layer with a
permeability no less than 1 x 10-2 cm/sec or placement of geonet and 24-inches
of a soil layer with no specified permeability; a 60 mil HDPE geomembrane liner
over 14 acres; the construction of 1,400 feet of 24-foot gravel access road;
construction of a sediment basin; installation of erosion control devices;
installation of underdrain and leachate collection piping; and leachate pump
station and force main. Bids will be accepted only from Pre-Qualified Bidders.