CITY MANAGER?S AGENDA
08/06/02
I. STREET ACCEPTANCE ? SUGAR MILL COURT:
Authorization is requested to approve the acceptance of a deed to Sugar
Mill Court located in Section Two, Sugar Mill Subdivision. The Department of
Engineering has inspected this street and recommends the acceptance. An agenda
report, resolution and map are included.
II. PURCHASES:
Approval is requested of item "A":
A. Annual Maintenance Support Agreement for the Decision Analyzer Software
REFERRALS:
1. Stop Sign
2. Four Way Stop Sign
3. Voters Registration Cards
4. New Voting Equipment
CITY MANAGER?S AGENDA ? PAGE 2
08/06/30
(Bid Advertisements)
August 6, 2002
1. Construction Management Services for the Main Library and System
Headquarters ? RFP No. 03-0003
A Pre-Proposal Conference will be held at 3:00 PM on August 6, 2002, in the
Ground Floor Conference Room of the Government Center Tower.
August 9, 2002
1. Geotechnical-Environmental Testing Services (Annual Contract) ? RFP No.
03-0002
Scope of RFP
Provide Columbus Consolidated Government, Engineering Department, with
geotechnical environmental services for soil and construction material testing
for the development or design of various construction projects on an ?as needed
basis?. The term of contract shall be for two years, with the option to renew
for three additional twelve-month periods. Contract renewal will be contingent
upon the mutual agreement of the City and the Contractor.
2. Construction Management Services for the Main Library and System
Headquarters ? RFP No. 03-0003
Scope of RFP
Provide construction management services for the new Main Library and System
Headquarters project.
CITY MANAGER?S AGENDA ? PAGE 3
08/06/02
(Bid Advertisements)
(Continued)
3. Professional Negotiating Consultants (Annual Contract) ? RFP No. 03-0004
Scope of RFP
Provide Columbus Consolidated Government with qualified professional
negotiating consultants to accommodate property owners or schedule let dates
during the acquisition program on an ?as needed basis?. The term of contract
shall be for two years, with an option to renew for three additional
twelve-month periods. Contract renewal will be contingent upon the mutual
agreement of the City and the Contractor.
4. Gym Floor Repairs, Stripping and Sealing ? Bid No. 03-0006
Scope of Bid
Repair and strip/seal wood gym flooring for Comer Gym, North Columbus Gym,
Shirley Winston Gym and Benning Park Gym. The work must be completed within a
total of three (3) consecutive days.
August 14, 2002
1. Schatulga Road Culvert Repair ? Bid No. 03-0001
Scope of Bid
Provide construction services to repair a storm culvert on Schatulga Road.
2. Drainage Improvements ? Summit Drive, Belvedere Park & Japonica Drive ? Bid
No. 03-0002
Scope of Bid
Provide construction services for drainage improvements at Summit Drive,
Belvedere Park and Japonica Drive.
CITY MANAGER?S AGENDA ? PAGE 4
08/06/02
(Bid Advertisements)
(Continued)
3. Concessionaire Services (Annual Contract) ? RFP No. 03-0006
Scope of RFP
Provide concessionaire services at the Columbus Consolidated Government Center
Complex. The term of the contract will be for three (3) years with the option
to renew for two (2) additional twelve (12) month periods.
August 16, 2002
1. Appraisal Review Services (Annual Contract) ? RFP No. 03-0008
Scope of RFP
Provide Columbus Consolidated Government with professional appraisal review
services on an ?as needed basis?. The term of contract shall be for two years,
with the option to renew for three additional twelve-month periods. Contract
renewal will be contingent upon the mutual agreement of the City and the
Contractor.
August 21, 2002
1. Street Improvements at Whitesville Road/Veterans Parkway and Blackmon Road
Turn Lane ? Bid No. 03-0004
Scope of Bid
Provide construction services for street improvements at Whitesville
Road/Veterans Parkway and Blackmon Road Turn Lane.
CITY MANAGER?S AGENDA ? PAGE 5
08/06/02
(Bid Advertisements)
(Continued)
2. Engineering Services Related to the Construction of Pine Grove MSW Landfill,
Phase 2, Cells 2A, 2B and 2C ? RFP No. 03-0007
Scope of RFP
Provide construction documents, construction administration and construction
quality assurance (CQA) services for the construction of Phase 2, Cells 2A, 2B
and 2C of Pine Grove Municipal Solid Waste Landfill. Services should include
relevant engineering and design, surveying, construction administration,
construction inspection, materials sampling and testing, preparation of
analytical reports, and all other reporting necessary to satisfy regulatory
provisions for CQA documentation