(D) STORM PIPE REPLACEMENT AT RIVER MILL ANTIQUE MALL
It is requested that Council approve a contract with Warr Grading Contractor,
Inc., in the amount of $23,069.00 to replace storm pipe at River Mill Antique
Mall in Bibb City.
The storm pipe replacement project site is adjacent to the Bibb Mill parking
lot. Warr Grading Contractor is currently replacing the storm pipe that runs
underneath the Bibb Mill parking lot; and the owner of Bibb Mill will pay for
this portion of the work. The section of the pipe that is connected to, but
extends beyond, Bibb Mill parking lot requires replacement as well, and the
City is responsible for this portion of the pipe replacement. Since the City?s
project is in such close proximity to the project in process at Bibb Mill
parking lot, it is only prudent to contract with the contractor who is already
on site, rather than expending the time and cost of formally bidding the
project. In addition, having two contractors on the same site could prove
counter-productive by doubling the traffic congestion and other inconveniences.
The contractor has inspected the site, reviewed the plans provided by the
Engineer, Jordan, Jones and Goulding, and submitted a lump sum cost proposal,
to the Engineering Department, to replace the pipe. The work will include the
following:
Demolition (Asphalt, Curb and Gutter Wall)
Install new 36? RCP as per Plans,
Trench Stabilization as needed
Install New Junction Box
New Storm Manhole to accommodate new pipe
Replace wall as needed
Replace curb and gutter as needed
Replace asphalt paving as needed
Traffic Control as needed
Construction staking
Soils testing as needed
The Engineering Department and the City?s contracted Engineer is confident this
vendor can perform the work, and the cost proposed is comparable to the cost
that is typical for this type of project. The vendor has agreed to provide the
necessary bonding and insurance required for this project.
Funds are budgeted in the FY04 Budget; Lease/Revenue Bonds - 2003A Series Bond
Project ? Drainage/Street Improvements ? Storm Water Enhancements;
0554-200-2439-CBA-7622-40235030.
?ITEM D?
A RESOLUTION
NO. ________
A RESOLUTION AUTHORIZING A CONTRACT WITH WARR GRADING CONTRACTOR, INC.,
IN THE AMOUNT OF $23,069.00 TO REPLACE STORM PIPE AT RIVER MILL ANTIQUE MALL IN
BIBB CITY.
WHEREAS, The storm pipe replacement project site is adjacent to the
Bibb Mill parking lot. Warr Grading Contractor is currently replacing the
storm pipe that runs underneath the Bibb Mill parking lot; and the owner of
Bibb Mill will pay for this portion of the work. The section of the pipe that
is connected to, but extends beyond, Bibb Mill parking lot requires replacement
as well, and the City is responsible for this portion of the pipe replacement.
Since the City?s project is in such close proximity to the project in process,
at Bibb Mill parking lot, it is only prudent to contract with the contractor
who is already on site, rather than expending the time and cost of formally
bidding the project. In addition, having two contractors on the same site
could prove counter-productive by doubling the traffic congestion and other
inconveniences; and,
.
WHEREAS, The contractor has inspected the site, reviewed the plans
provided by the Engineer, Jordan, Jones and Goulding, and submitted a lump sum
cost proposal, to the Engineering Department. The Engineering Department and
the City?s contracted Engineer is confident this vendor can perform the work,
and the cost proposed is comparable to the cost that is typical for this type
of project. The vendor has agreed to provide the necessary bonding and
insurance required for this project.
NOW, THEREFORE, THE COUNCIL OF COLUMBUS, GEORGIA, HEREBY RESOLVES AS FOLLOWS:
That the City Manager is hereby authorized to enter into a contract
with Warr Grading Contractor, Inc., in the amount of $23,069.00 to replace
storm pipe at River Mill Antique Mall in Bibb City. Funds are budgeted in the
FY04 Budget; Lease/Revenue Bonds - 2003A Series Bond Project ? Drainage/Street
Improvements ? Storm Water Enhancements; 0554-200-2439-CBA-7622-40235030.
________________________________________
Introduced at a regular meeting of the Council of Columbus, Georgia, held
the _________ day of _________________, 2004 and adopted at said meeting by the
affirmative vote of _________ members of said Council.
Councilor Allen voting __________.
Councilor Anthony voting __________.
Councilor Davis voting __________ .
Councilor Henderson voting __________.
Councilor Hunter voting __________.
Councilor McDaniel voting __________.
Councilor Turner Pugh voting __________.
Councilor Rodgers voting __________.
Councilor Suber voting __________.
Councilor Woodson voting __________.
_______________________________ _____________________________
Tiny B. Washington, Clerk of Council Robert Poydasheff, Mayor