To
-
Mayor and Council
-
Subject
-
Street Acceptance - Portion of Bentley Drive and Grand Lane
-
Initiator
-
Engineering Department
-
Recommendation
-
Approve the acceptance of a deed to that portion of Bentley Drive and Grand \n \n Lane, located in Phase Two, Cedar Pointe Subdivision.
-
Approval
-
Approved
-
Background
-
Phase Two, Cedar Pointe Subdivision, currently consists of forty-three
residential lots. The streets have been improved and meet the required
specifications for acceptance by the City.
-
Analysis
-
A deed has been submitted conveying to the City that portion of Bentley Drive
and Grand Lane located in Phase Two, Cedar Pointe Subdivision. Description of
the property is as follows: "All those tracts of land, lying and being in Part
of Land Lots 256, 257, and 258, 17th District, Muscogee County, Georgia, being
those certain roads and road rights of way and more particularly described as
follows as all of Bentley Drive and Grand Lane in Phase Two, Cedar Pointe
Subdivision, as said roads are shown on the map or plat entitled "Phase Two,
Cedar Pointe, prepared by William A. White, dated March 31, 2003, and recorded
in Plat Book 148, at Pages 116 through 118, in the public records of Muscogee
County, Georgia, and to which map or plat reference is hereby made for a more
particular description of the street hereby conveyed."
-
Financial Considerations
-
No City funds are involved until maintenance is assumed after the two-year
warranty expires.
-
Projected Annual Fiscal Impact Statement
-
-
Legal Considerations
-
In accordance with Section 18-3 of the Columbus Code, all dedicated
right-of-ways must be accepted by written resolution of Council.
-
Recommendations/ Actions
-
Approve the Resolution accepting a deed to that portion of Bentley Drive and
Grand Lane located in Phase Two, Cedar Pointe Subdivision.
No attachments for this document.