Buena Vista Road Widening
-
Initiator
-
Richard Bishop, Deputy City Manager
-
Recommendation
-
Approval is requested to amend the Buena Vista Road Project from a four lane \n \n with turn lanes to a three lane with intersection improvements.
-
Approval
-
Approved
-
Background
-
The Buena Vista Road Project has been a part of the Long Range Plan for
transportation improvements. During the planning process this project was set
up to be a four lane section with turning lanes. This concept was established
based on demographic projections that have not materialized.
During the public involvement process the proposed concept had community wide
opposition. As a part of this process an alternate concept was developed by
an engineering consultant under contract with Mid-Town organization. The
concept is a 3 lane section with intersection improvements. This concept is
more in line with the Department of Transportation's Context Sensitive Design
scheme, than the original 4 lane with turning lane concept. The alternate
concept does have the potential to present right of way challenges in the
future if widening of the network becomes necessary. The alternate concept
provides a more pedestrian friendly road network and the opportunity for
economic growth along the network.
-
Analysis
-
DOT provided a Long Range Transportation Model for the traffic projections
for this area.
-
Financial Considerations
-
Department of Transportation and Federal Highway will have to approve new
concept before funding can be identified.
-
Projected Annual Fiscal Impact Statement
-
-
Legal Considerations
-
N/A
-
Recommendations/ Actions
-
Approval is requested to amend the Buena Vista Road Project from a four lane
with turn lanes to a 3 lane with intersection improvements.