To
-
Mayor and Council
-
Subject
-
Three Lane Stripping of Martin Luther King, Jr. Boulevard
-
Initiator
-
Planning Department
-
Recommendation
-
Approve the resolution authorizing the City Manager to implement the \n \n re-stripping of Martin Luther King, Jr. Boulevard to a three lane roadway from \n \n Buena Vista Road to 10th Avenue
-
Approval
-
Pending
-
Background
-
Martin Luther King, Jr Boulevard runs between Buena Vista Road and 10th Avenue,
consisting of two sections. Currently the section between Buena Vista Road
and Brown Avenue is four lanes, with a center turn lane, while the section
between Brown Avenue and 10th Avenue is four lanes only. The average daily
traffic for the entire length of this road totals no more than 7,700, far below
the projected carrying capacity of 22,200 for a roadway of this type. As part
of the proposal by the Planning Department to enhance this thoroughfare, it was
recommended that the entire boulevard be reduced to three lanes. This
reduction would still accommodate the traffic needs of the area, while adding
lanes for bicycles, walking/running areas, and landscaping amenities. Before
committing fully to this proposal, staff has proposed that a trial period
utilizing the three lane concept be initiated to determine what, if any,
impact, this may have on this road. This can be accomplished during the
resurfacing of this street, which is scheduled for this year. At that time,
the entire roadway would be restriped to a three lane, with bike lanes in each
direction.
-
Analysis
-
The restriping to three lanes will provide the opportunity to determine how
well this roadway will function under these conditions, prior to any other
proposed aesthetic improvements being made to this corridor. After the
restriping, a review period will be undertaken, with a report back to Council,
to determine the overall effect of these improvements. This review will be
particularly important as the new Brown Avenue bridge comes on line and
improvements are made to the Spiderweb area in the near future.
-
Financial Considerations
-
Funding for the resurfacing has already been authorized in the amount of
$800,000.
-
Projected Annual Fiscal Impact Statement
-
General maintenance may be required for stripping over time.
-
Legal Considerations
-
There are no legal considerations.
-
Recommendations/ Actions
-
Approve the resolution authorizing the City Manager to implement the
re-stripping of Martin Luther King, Jr. Boulevard to a three lane roadway from
Buena Vista Road to 10th Avenue