-
To
-
Mayor and Council
-
Subject
-
13th Street Bridge Closure
-
Initiator
-
Engineering
-
Recommendation
-
Approve the attached resolution authorizing a multi-day closure of the 13th \n \n Street Bridge across the Chattahoochee River for five days.
-
Approval
-
Pending
-
Background
-
The City is working with a movie production company who requested filming a
portion of their movie (Need for Speed) on the 13th Street Bridge over the
Chattahoochee River. As noted on the attached letter, they requested that the
bridge be closed for five days, June 4th thru 8th.
-
Analysis
-
City staff met to discuss this request plus the use of certain Public Safety
personnel and equipment. The Engineering Department is reviewing the proposed
detour that will be needed to be in place to accommodate the bridge closing.
13th Street bridge traffic will be detoured to Veterans Parkway south to 4th
Street west across the Oglethorpe Bridge to Martin Luther King, Jr. Parkway to
Broad St (Phenix City) to 13th Street and the reverse travel pattern.
The NFS production crew is coordinating the needs for this filming with both
Columbus and Phenix City. The primary need for the bridge closure is for the
set up time to shoot each film sequence. There is an accident scene in the
movie on the bridge which requires ramping and a large crane to be set up. All
of their work will be accomplished without any damage to the bridge or
contamination to the river.
The proposed resolution authorizes the Police Chief and Traffic Engineering
Manager to approve alternate days should weather or other conditions require
rescheduling the closure dates.
-
Financial Considerations
-
NFS Productions will compensate the City for any personnel, vehicles and
equipment needing for their work.
-
Projected Annual Fiscal Impact Statement
-
This movie may make Columbus a more attractive destination for the movie
industry.
-
Legal Considerations
-
The City staff has advised NFS Productions of the liability insurance
requirements for the work and to protect the City.
-
Recommendations/ Actions
-
Approve the closure of the 13th Street Bridge for five days.
No attachments for this document.