To
-
Mayor and Council
-
Subject
-
Abandonment of a Portion of Drainage and Utility Easement located in the rear portion of 1008 Eden Street
-
Initiator
-
Donna Newman
-
Recommendation
-
Approval is requested to execute a Quit Claim Deed to Mike Massey for \n \n abandonment of a three (3) foot wide section along the northern edge of the \n \n existing ten (10) foot drainage and utility easement of Lot 39, Block "P" \n \n Meadow Run Subdivision.
-
Approval
-
Pending
-
Background
-
Mike Massey, owner of Lot 39, Block "P" Meadow Run Subdivision (1008 Eden St)
submitted a request for a building permit to the Inspection and Codes
Department at which time he found out that the structure he made application to
have built fell three (3) feet into a drainage and utility easement. All known
utilities have be contacted and agree to the abandonment of no more than three
(3) feet of the existing drainage and utility easement.
-
Analysis
-
Mike Massey, owner of Lot 39, Block "P" Meadow Run Subdivision (1008 Eden St)
submitted a request to the Engineering Department requesting a portion of the
existing Drainage and Utility Easement be abandoned in order to construct a 18'
x 30' metal structure on a concrete slab at the rear of his property. After
checking with the utility companies, it is in agreement that a three (3) foot
wide section along the northern edge of the of the existing ten (10) foot
drainage and utility easement can be abandon. Diverspower agreed to only
relinquish the (3) foot wide section leaving the remainder (7) foot on Lot 39,
Block "P". We have found no present or future use of that portion of the
existing easement. The remainders of all utility easements of record remain in
effect and providing appropriate width as required by the applicable utility
companies will be required for unknown utilities, repealing any conflicting
ordinances, and for other purposes.
-
Financial Considerations
-
None
-
Projected Annual Fiscal Impact Statement
-
N/A
-
Legal Considerations
-
The Council must approve the action by resolution
-
Recommendations/ Actions
-
Authorizing the City Manager to execute the Quit Claim Deed to Mike Massey for
abandonment of a three (3) foot wide section along the northern edge of the
existing ten (10) foot drainage and utility easement of Lot 39, Block "P"
Meadow Run Subdivision in order to construct a 18' x 30' metal structure.
No attachments for this document.