To
-
Mayor and Council
-
Subject
-
J.R. Allen Parkway / US 80 Corridor Study
-
Initiator
-
Planning Department
-
Recommendation
-
Approval is requested to enter into a contractual agreement with the Georgia \n \n Department of Transportation (GDOT) to accept Federal/State Transportation \n \n Planning Funds to conduct a study of the J.R. Allen Parkway / US 80 Corridor.
-
Approval
-
Pending
-
Background
-
The purpose of this study is to determine if an additional lane is needed in
both directions and examine the interchanges to see if they warrant any
improvements. J.R. Allen / US 80 is a major east - west corridor that averages
60,000 vehicle trips per day in some locations.
-
Analysis
-
The completion of this study will determine where improvements are needed and
an estimated cost of the improvements.
-
Financial Considerations
-
Cost of the study is $200,000.00 ($160,000 - 80% Federal) and will be funded
through the use of Federal/State Transportation Planning funds allocated to the
Columbus-Phenix City Transportation Study (C-PCTS). These funds require a 20%
match of $40,000.00 and is funded from the OLOST Infrastructure Roads account.
-
Projected Annual Fiscal Impact Statement
-
The study will determine future improvements to the J.R. Allen Parkway / US 80
corridor. Costs associated with this project will be determined at a later
date.
-
Legal Considerations
-
The City Attorney has approved this action.
-
Recommendations/ Actions
-
Approve the resolution authorizing the City Manager to enter into a contractual
agreement with the Georgia Department of Transportation to accept the
Federal/State Transportation Planning Funds to conduct a study on J.R. Allen
Parkway / US 80.