-
To
-
Mayor and Council
-
Subject
-
Abandonment of all easements located on Big Creek Drive Lot 45, Block "A" also known as 7891 Big Creek Drive located in Section Two, Big Creek Subdivision
-
Initiator
-
Engineering
-
Recommendation
-
Approval is requested to execute a Quit Claim Deed to James E and Peggy A Salie \n \n for abandonment of a ten foot drainage and utility easement located on the rear \n \n portion and the entire Storm Sewer Easement running along the eastern property \n \n line of Lot 45, Block "A" also known as 7891 Big Creek Drive on Big Creek Drive \n \n in Section Two Big Creek Subdivision
-
Approval
-
Pending
-
Background
-
Homeowners James E and Peggy A Salie have submitted a request to the
Engineering Department that all easements located on their property at Big
Creek Drive Lot 45, Block "A" also know as 7891 Big Creek Drive, located in
Section Two Big Creek Subdivision, be abandoned in order to construct a storage
building at the rear of their property. All known utilities have been contacted
and agree to the abandonment of a ten foot drainage easement located on the
rear portion and the entire Storm Sewer Easement running along the eastern
property line of Lot 45, Block "A" on Big Creek Drive in Section Two Big Creek
Subdivision as shown on the highlighted plat.
-
Analysis
-
Homeowners James E and Peggy A Salie have submitted a request to the
Engineering Department that all easements located on their property at Big
Creek Drive Lot 45, Block "A" also know as 7891 Big Creek Drive, located in
Section Two Big Creek Subdivision, be abandoned in order to construct a storage
building at the rear of their property. After checking with the utility
companies, it is in agreement that the ten (10) foot drainage and utility
easement that is located on the rear portion. The Rainwater Management Division
checked and has found no present or future use of the entire Storm Sewer
Easement (noted as being a private drainage system) along the eastern property
line of Lot 45, Block "A" located on Big Creek Drive and within Section Two,
Big Creek Subdivision. The remainders of all utility easements of record in
effect and providing appropriate width as required by the applicable utility
companies will be required for unknown utilities, repealing any conflicting
ordinances, and for other purposes.
-
Financial Considerations
-
None
-
Projected Annual Fiscal Impact Statement
-
N/A
-
Legal Considerations
-
The Council must approve the action by resolution.
-
Recommendations/ Actions
-
Authorizing the City Manager to execute a Quit Claim Deed to James E and Peggy
A Salie for abandonment of a ten foot drainage and utility easement located on
the rear portion and the entire Storm Sewer Easement running along the eastern
property line of Lot 45, Block "A" also known as 7891 Big Creek Drive on Big
Creek Drive in Section Two Big Creek Subdivision to construct a storage
building.
No attachments for this document.