To
-
Mayor and Council
-
Subject
-
Resurfacing and Restriping of Martin Luther King, Jr. Boulevard (MLK, Jr. Boulevard)
-
Initiator
-
Planning Department
-
Recommendation
-
Approve the resolution authorizing the resurfacing, restriping, of Martin \n \n Luther King, Jr. Boulevard, with the addition of a 12 foot multi-use trail and \n \n intersection improvements at Brown Avenue and Martin Luther King, Jr. \n \n Boulevard.
-
Approval
-
Pending
-
Background
-
Martin Luther King, Jr Boulevard runs between Buena Vista Road and 10th Avenue,
consisting of two sections. Currently the section between Buena Vista Road
and Brown Avenue is four lanes, with a center turn lane, while the section
between Brown Avenue and 10th Avenue is four lanes only. The average daily
traffic for the entire length of this road totals no more than 7,700, far below
the projected carrying capacity of 22,200 for a roadway of this type. This
project would resurface the entire length of MLK, Jr. Boulevard, while leaving
intact the existing laneage in place. Additional road improvements will
include the construction of a 12 foot multi-use trail from Buena Vista Road to
10th Avenue, plus signal and intersection improvements at MLK, Jr. Boulevard
and Brown Avenue.
-
Analysis
-
This is a road resurfacing project that is needed for this roadway. The road
will be restriped exactly as it is configured today, with five lanes from Buena
Vista Road to Brown Avenue, and four lanes from Brown Avenue to 10th Avenue.
The exception to this would be the reduction of one west bound lane for
approximately 2,300 linear feet from Magnolia Avenue to Davis Elementary
School. The purpose of this action is to accommodate the 12 foot wide multi-use
trail that will be constructed along the entire length of the north side of the
road. This reduction in this one lane is due to the lack of necessary right of
way needed for the trail for this portion of the roadway. In addition, an
upgrading of the signals at Brown Avenue and MLK, Jr. Boulevard would be
performed, along with landscaping and improvements to the pedestrian crossings.
-
Financial Considerations
-
Funding has been allocated in the amount of $4,000,000 from the OLOST
Infrastructure, Paving Fund, and TSPLOST Discretionary funds.
-
Projected Annual Fiscal Impact Statement
-
Minimal maintenance is expected over the ten year period upon completion of
this project.
-
Legal Considerations
-
There are legal consideration at this time.
-
Recommendations/ Actions
-
Approve the resolution authorizing the resurfacing, restriping, of Martin
Luther King, Jr. Boulevard, with the addition of a 12 foot multi-use trail and
intersection improvements at Brown Avenue and Martin Luther King, Jr.
Boulevard.